Recycled water filling stations
Allconnex Water operates 10 recycled water filling stations in the Gold Coast district. All filling stations are accessed through an automated system which requires an access device from Allconnex Water. Filling stations are configured with a 63mm (2½ inch) male camlock fitting.
For information on becoming a registered recycled water carrier visit Recycled water for industry.
Locations
| Tugun |
Access through Gold Coast City Council Waste Disposal Facility Boyd Street, Tugun |
24 hour access Security access car 63mm camlock fitting |
| Currumbin |
Car Park at clubhouse Salk Oval Sarawak Avenue, Currumbin |
24 hour access 63mm camlock fitting |
| Elanora |
Elanora Wastewater Treatment Plan End of Tallebudgera Drive, Elanora |
24 hour access Security access card 63mm camlock fitting |
| Merrimac |
Merrimac Wastewater Treatment Plan Boowaggon Road, Merrimac |
24 hour access Security access card 63mm camlock fitting |
| Benowa |
Old Wastewater Treatment Plan Racecourse Drive, Benowa |
24 hour access Security access card 63mm camlock fitting |
| Parkwood |
Beside Sharks Junior Rugby League Club Access road off Musgrave Avenue |
24 hour access 63mm camlock fitting |
| Coombabah |
Wastewater Treatment Plan End of Shelter Road, Coombabah |
6am-6pm Security access card for 24 hour access |
| Runaway Bay |
Opposite Runaway Bay Sports Supercentre Sports Drive, Runaway Bay |
24 hour access 63mm camlock fitting |
| Pimpama |
Wastewater Treatment Plant Kirkin Road North, Pimpama |
24 hour access Security access card 63mm camlock fitting |
| Alberton |
Zipfs Park - Cricket Ground Zipfs Road, Alberton |
24 hour access 63mm camlock fitting |
| Beenleigh |
Wastewater Treatment Plan Logan Road, Eagleby |
24 hour access 63mm camlock fitting |
Station operating instructions
1. Park the vehicle in proximity of the filling point without obstructing other users.
2. Connect the outlet of the filling point to approved vessel.
3. Open valve to suit your requirements.
4. Place the access key on the reader for validation.
- Light on = valid key – Go to Step 5.
- Light flashing = invalid key – Contact Allconnex Water during office hours.
5. Press ‘ON’ button to start delivery of recycled water.
- Light on = water is flowing.
- Light flashing = water is not flowing – Please call Allconnex Water to report the fault.
6. Close the valve.
7. Press ‘OFF’ button to stop the delivery of recycled water.
8. Disconnect the hose.
9. Move away to allow other users to access the filling station.