The Gold Coast's Standard Specifications and Drawings for Water Reticulation and Sewerage Reticulation will assist all designers and asset providers within the development and construction industry.
These standards should be read in partnership with Gold Coast City Council’s Land Development Guidelines for roads and stormwater drainage standard specifications.
Areas of the Gold Coast Planning Scheme 2003 Policy 11 - Land Development Guidelines that apply to Water Reticulation and Sewerage Reticulation can be viewed in the in the PDF links below.
Volume 1
Volume 2
Volume 4
Volume 5
Additional Information
Allconnex Water’s Gold Coast district has additional documents that control certain asset components. These documents are not directly available within Gold Coast City Council’s Planning Scheme 2003. They are available upon request by contacting the officers below.
SS11 - Specifications for construction of concrete reservoirs drawings covers the construction of on-ground reinforced or prestressed concrete water supply reservoirs.
This specification does not cover steel reservoirs, reservoirs that incorporate a liner material nor reservoirs constructed from ferrocement. Also, this specification does not cover elevated reservoirs involving a reservoir support structure.
Please contact:
Bruce Douglas – Asset Officer Specifications bruce.douglas@allconnex.com.au or 07 5582 8164
SS12 - General requirements for electrical installations drawings covers the general requirements for electrical installations within water and wastewater pump stations and treatment plant instrumentation.
SS14 - General requirements for mechanical installations covers the provision of mechanical components within pumping stations and other large asset forms.
Please contact:
Lewis Wells - Manager, Standards and Specifications lewis.wells@allconnex.com.au or 07 5582 8943